• Construction Hoist SC150D,Electric Parts from World Renowned Manufactures such as Schneider, Siemens, and LG System 1
  • Construction Hoist SC150D,Electric Parts from World Renowned Manufactures such as Schneider, Siemens, and LG System 2
  • Construction Hoist SC150D,Electric Parts from World Renowned Manufactures such as Schneider, Siemens, and LG System 3
  • Construction Hoist SC150D,Electric Parts from World Renowned Manufactures such as Schneider, Siemens, and LG System 4
  • Construction Hoist SC150D,Electric Parts from World Renowned Manufactures such as Schneider, Siemens, and LG System 5
Construction Hoist SC150D,Electric Parts from World Renowned Manufactures such as Schneider, Siemens, and LG

Construction Hoist SC150D,Electric Parts from World Renowned Manufactures such as Schneider, Siemens, and LG

Ref Price:
$50,000.00 - 80,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


SC Hoist is a Rack and Pinion EL. Lift, used on construction site for transportation of personnel and materials. It is installed and dismounted conveniently and can grow as high as the buildings grow in height.

 There are single cage and twin cage hoists. A single cage can be quickly transformed into twin cage hoist by adding a cage and other parts. The hoist payload can be increased by adding counterweight equipment.

 SC Hoist has reliable electrical and mechanical safety device. It is a efficient and safety vertical transporting equipment.

 

Structure of Construction Hoist Description


Feature: Construction Hoist                       Condition: New                                           Application: Construction           

Payload(kg):2700                                          Lifting Speed(m/min):33                             Motor Power(kw): 3*15

Safety Device: SAJ50-1.2                              Cage: Single                                              Counterweight: No

Certification: CE,ISO                                      Place of Origin: China(Mainland)               Model Number: SC150D 

 

Construction Hoist Specifiction

Main technical data

Unit

Value

Rated load

kg

1500

Rated erection load

kg

1000

Jib attachment rated load

kg

300

Cage size

m

3.0×1.3×2.5

Maximum lifting height

m

250

Lifting speed

m/min

045

Rated output

kW

2×18.5

Voltage rating

V

380/440

Rated frequency

Hz

50/60

Rated current

A

2×37.8

Power supply fuses

A

96

Protective class

/

IP55

Load duration factor

/

FC-25%

Safety device

m/s

1.2

Enclosure weight

kg

980

Cage weight

kg

1850

Counterweight

kg

/

Mast section weight

kg

125/145

Mast section length

mm

1508


Packaging & Delivery of Construction Hoist 


Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Building hoist inmmages

 

 

Main Parts of Construction Hoist


● The gearing adopts imported bearing, enameled cable, and oil seal.

 

● The electric parts adopt products from world renowned manufactures such as Schneider, Siemens, and LG.

 

● The racks and pinion adopts special material and heat-treatment technique, which prolong the life of these parts.

 

● The steel structure uses quality steel from famous domestic manufactures.

 

● The surface of the structure can apply paint-spray, parkerozing baking finish or hot galvanizing processing according

    to users requirements,

 

● The cage can be produced and decorated by aluminum molded board, punched-plate or figured aluminm board.

 

FAQ of Construction Hoist


Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  

 

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance

 & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.  

Q:How much cable does the construction elevator 44KVA need?
44KW three phase power: 79A, BV5X16
Q:There are differences between the construction elevator and the construction elevator
When it comes to the construction elevator, people will immediately think of construction lifter, the construction elevator and elevator is just a different name or have their own respective working principle? By below small make up to you to introduce: construction elevator is often referred to as construction lifter, but construction lifter, including the definition of a broader platform construction also belongs to the construction lifter series.
Q:Why do you ask the construction elevator to be a certain distance from the structure? Is very close to if not you can not bother to do delivery channel security protection or something, out of the elevator out directly, and attachment should be able to get more easily, to solve. Thank you very much!!
The country stipulates that the distance between the moving parts of the elevator and the building and the fixed construction equipment should not be less than 0.25 meters. It's mainly about safety.
Q:For example, what records do you want to have a third party monitoring?
After the construction elevator overhaul, the contents of the inspection and acceptance inspection shall be inspected; In the use of elevators, the contents of the regular inspection shall be conducted once a year in accordance with the provisions of the regulations.
Q:Is there a specification requirement for the floor door of the elevator to the floor? How high
There is no technical requirement, usually to see party a's request, want to be with party a the ground level that finish finished decorate just like, can,
Q:How many kw is the sc construction elevator
The construction elevator sc200/200 is rated at 63 kw power, and the power consumption is greater.
Q:What is the main function of the construction elevator safety guard
Falling to a certain speed will automatically card death
Q:The construction of more than many floors must be used for construction elevators
Elevator drivers must be trained in special safety technology, qualified for examination, and will be on duty. Strict drunken work. The driver must be familiar with the performance, construction, maintenance and maintenance of the elevator, and fill in the mechanical resume and the required reports in time. No inflammable, flammable goods and other sundries shall be piled up in the vicinity of 5m in the construction elevator, and no ditch, pits, or groove shall be dug in this area. The floor feed of the elevator should be set up for protection. When the cage is repaired, if the parts are removed and the weight of the ladder is below the weight, the ladder cage must be locked in the rail. It is strictly forbidden to use the shaft of the construction elevator to support the cable line and other items not related to the elevator. A tower crane or other lifting machine that is built on the same site shall be more than 5m above the elevator and should be properly protected against collision. After the construction elevator is installed, it must be checked and approved by the relevant personnel.
Q:A lift motor is 7.5 KW, and the frequency converter sends current 4.2 A, which has A heating resistance in the converter, and how the charge is calculated when the lift is full. Or consider the power of the converter and the power of the thermal resistance.
Try using the security software. There is a cracked version
Q:What is the height of protecting door protection of construction elevator
Referring to the unified code of construction safety technology of GB 50870-2013, and the construction safety inspection standard JGJ59-2011

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords