• Hydraulic Platform of Scaffolding for Repairing in Aerial Work from CNBM! System 1
  • Hydraulic Platform of Scaffolding for Repairing in Aerial Work from CNBM! System 2
  • Hydraulic Platform of Scaffolding for Repairing in Aerial Work from CNBM! System 3
  • Hydraulic Platform of Scaffolding for Repairing in Aerial Work from CNBM! System 4
Hydraulic Platform of Scaffolding for Repairing in Aerial Work from CNBM!

Hydraulic Platform of Scaffolding for Repairing in Aerial Work from CNBM!

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2 set
Supply Capability:
200 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Type:

Elevators

Place of Origin:

Shandong, China (Mainland)

Brand Name:

HAISHAN

Model Number:

SC200/200

Usage:

Construction elevator

Drive Type:

Rack & Pinion

Elevator Type:

Goods Elevators

Condition:

New

Power Source:

Electric

Sling Type:

Cable

Maximum Lifting Weight:

2*2000KG

Maximum Lifting Height:

150M

Lift Speed:

0-40m/min

Certification:

GOST,ISO

Warranty:

One year

Packaging & Delivery

Packaging Details:

containers

Delivery Detail:

10--15days

Main parameters of SC200/200 construction hoist

 

The SC200/200Construction Elevator is an external construction hoist with a three- drive rack-and-pinion mechanism. It has a rated loading capacity of 2 tons and a rated hoisting height of 150 meters. A simple alteration can change it into a single-cage construction elevator with a rated loading capacity of two tons. The SC200/200Construction Elevator is equipped with a state-patented safety device which can brake automatically in case of accidental fall. The driver element on top of the cage is safe and reliable and convenient for maintenance. The elevator with a maximum hoisting height of 300 meters is widely used for construction work such as industrial and civil construction, bridge construction, underground mining, large chimney construction and the shipping industry. It can be used for transporting materials or people vertically, as a permanent or half-permanent lift, or in places like storehouses and tall towers.

Mode

Rack-and-pinion Threee-drive Double-cage Construction Elevator

Rated Loading Capacity

2×2000 kg

Passengers Loaded

2×24 persons

Rated Hoisting Speed

34 m/min

Rated Hoisting Height

150 m (Goods-supply Height: 50m)

Inside Dimension of Suspension Cage (L×W×H)

3m ×1.3m ×2.4 m

Power Consumption

2×3×11(KVA)

Motor Power

11KW

Weight of Standard Section

140 kg

Height of Standard Section

1.508 m

Type of Safety Device

SAJ30-1.2 50m

Gross Weight

10.56t

 

Hydraulic Platform of Scaffolding for Repairing in Aerial Work from CNBM!

Hydraulic Platform of Scaffolding for Repairing in Aerial Work from CNBM!

Hydraulic Platform of Scaffolding for Repairing in Aerial Work from CNBM!


Q:Do hardware or plastic factories have no need for cutting tools?
Cutting tools must be needed. Hardware accessories refer to some small hardware, such as door locks, hinges, nuts and other mechanical components.
Q:The permanent magnet use principle
The working principle of permanent magnet lifting jack is the use of the principle of Faraday electromagnetic induction to manufacturing.
Q:The permanent magnet (permanent magnet sucker) the principle of who knows?
The permanent magnetic chuck, also known as a permanent disk, is a magnetic chuck because it is known for its long or permanent magnetism. According to its use, application range can be classified, because of its convenient operation, energy saving and environmental protection, is widely used in the machinery manufacturing industry.
Q:When should the temporary fixing tool for lifting work be removed?
Phosphating coating to improve the wear resistance and corrosion resistance of steel wire, not easy to wear and corrosion, is to improve the service life of wire rope reasons, smooth steel wire rope is being completely eliminated.
Q:Working principle of mechanical screw jack
Screw jack, also known as mechanical jack, is driven by the screw through the screw, screw or nut sleeve as a lifting device. Ordinary screw jack by thread self-locking function support heavy, simple structure, but the transmission efficiency is low, return slow. The self - lowering screw jack has no self-locking function and is equipped with a brake. When the brake is relaxed, the weight can fall rapidly and shorten the return time, but the jack structure is complicated.
Q:What are the protective measures against crane injuries?
Avoid travel with load, short distance travel with load load can allow the weight of 70% members from the ground using 50cm.Two crane lifting reasonable load distribution, unified command and close coordination.The sling should be calculated and the binding method is reliable. Lifting tools are regularly checked.The center of gravity and the weight lifting point should be in the same vertical line, hanging point should be in the center of gravity above.The commander must be certified, in close coordination with the crane driver.It is prohibited for lifting heavy objects long time hanging in the air.To check the ring hook, hook ring welding is prohibited.
Q:What's the difference between a pneumatic balancer and a spring balancer?
Pneumatic balancer is to use gas as power to lift or transfer heavy objects, can realize the suspension of heavy objects, in other words, can make heavy objects in the air "floating", so that the heavy objects can be operated.
Q:What are the points for attention in the course of transportation of double beam cranes?
Transportation conditions, transportation conditions, including on-site transportation, road construction, inspection and commissioning, etc..(1) construction of road transportation on site. According to the shipping component vehicle load size, body size, grade and standard requirements to determine the construction of temporary road pavement width and subgrade, pavement structure, construction site of the road transport people.(2) check the routes and routes. Transport drivers in Zhengzhou steel company and the relevant personnel along the exploration of transport routes, smooth road, road slope and road turning radius, or wire obstacles such as bridge and culvert clearance size are higher.(3) test run. The transport frame of the largest size component shall be installed on the vehicle, and the dimensions of the components shall be simulated and tested along the transport road.
Q:Working principle of mechanical screw jack
Screw jack, also known as mechanical jack, is driven by the screw through the screw, screw or nut sleeve as a lifting device. Ordinary screw jack by thread self-locking function support heavy, simple structure, but the transmission efficiency is low, return slow. The self - lowering screw jack has no self-locking function and is equipped with a brake.
Q:Hoisting safety notice
Measures to prevent falling from the sky (1). The operator must use the seat belt correctly when doing aerial work. The seat belt should be hung high and lowered, and the hook ring at the end of the belt rope will be hung at the top, while the person will operate at the lower level. (2) in the upper use of the lever, people should stand firm, such as nearby scaffolding or already installed components, should be one hand, live, hand operation. Pry into the depth of insertion should be appropriate, if the move from a larger distance, it should gradually move, should not be anxious for success. (3) if workers need to work at high altitude, they should set up temporary operating platform as far as possible. The operation of Taiwan as a tool, the width is 0.8 ~ 1 m temporary splint in the upper column angle, below the location of 1.0m ~ 1.2m, and the welding work of workers can be corrected in the roof above. (4). For walking in the high altitude suspension truss on, should be set up on the safety railing. (5) ladders for climbing must be firm. When used, the rope must be fastened to the fixed member. The angle between the ladder and the ground is generally 65~70 degrees. (6). By the operator in the scaffold board, should be focused on, to prevent lead plate. (7) when installing a reserved floor or roof board, it should be covered with wooden planks in time. (8) the operator shall not wear hard soled shoes for aerial work.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords