• Matching Mixing Plant Construction Machinery System 1
  • Matching Mixing Plant Construction Machinery System 2
Matching Mixing Plant Construction Machinery

Matching Mixing Plant Construction Machinery

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
5000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Matching Mixing Plant Construction Machinery

Matching Mixing Plant Construction Machinery

BRIEF INTRODUCTION

 

Theory productivity 75 m3/h              Matching mixer JS1500

Discharging height  3.8 m                Aggregate metering precision ±2%

Cement weighing precision ±1%         Water weighing precision ±1%           

Additive weighing precision ±1%

Control room 6 m2                        Aggregate hopper volume 15m³×4

Cement silo: 100t   (optional)           Cement screw conveyor: Ф219 (optional)

Floor area 30m×12m                    Total power: about 105 kW(Not including screw conveyor)

Gross weight :33 tons(not including screw conveyor and cement silo)

PART III: TECHNICAL DATA

 

Item

Specification


 

 

 

 

  1

Aggregate Supply System is composed of aggregate bin, frame, weighing hopper, 

aggregate conveyer and sensors.

1、 Aggregate bin

⑴ Volume: 15m3×4

⑵ The feeder: 8

⑶ Cylinder: bore 100 stroke 300 (with solenoid valve)  

8 pieces 

2、 Weighing hopper:

⑴ Volume: 5000L

⑵ Measure mode: measure together

⑶ Sensor: STL-2000 qty: 4  Amcell America

⑷ Measuring precision: ±2%

3、  Belt conveyor with cleaner 

⑴ Belt specification: 650mm  

⑵ Belt speed

4.   Driven drum:CG-φ320*750Z

Electric power: 7.5kW

5.   Vibrator: MVE200/3  Oli-wolong 

Power: 0.15kW      4 sets

2

The elevating system 

1) Electric Windlass:  Power: 22kW

2) Convey capacity: 2400L

3) No Temporary storage hopper

4) Discharging material gas cylinder: 

5)  Windlass engine: XWN39-17-22

3

Mixing System

Model: JS1500/Twin-shafts horizontal forced type

Charging volume: 2400 L

Discharging volume: 1500 L 

Discharging height: 3.8m

Motor power: 30kW×2

Mixing blade、 lining board: wear resistance material

System instruction:

Planetary gear reducer, small volume,high efficiency,high reliability.

Lining board and material of blade are chrome wear-resisting cast iron, reasonable design 

of angle and quality mixing efficiency,quick speed and long service life.

Discharging gate is controlled by hydraulic oil pump. There are three stick points and no noise.

Overweight design and good damping

4

Mixing Platform 

Discharge height  3.8m

Mixing platform 

electromagnetism valve

Stairway, platform, handrails

5

Cement weighing system

Cement weighing system is composed of cement weighing hopper, pneumatic butterfly valve, sensors and so on.

Cement weighing system

Volume: 700L 

Weighing range: 0~700 kg

Weighing precision: ±1%

Sensor: SSB-Ⅲ-500  Qty.: 3 Amcell America 

Pneumatic butterfly valve: BV1F300S 

Vibrator MVE100/3 Oli-wolong

Power: 0.09kW   

6

Water weighing system

Water weighing system is composed of pool (made by 

customer themselves), water pump, pneumatic butterfly valve and so on.

Volume: 500L 

water supply pump:  QY50-18-4kW  

Pipe pneumatic ball valve

Discharging pneumatic butterfly valve

Weighing precision: ±1%

7

Additive weighing system including the box and pipeline

Liquid additive weighing system is composed of additive storage box, additive weighing hopper, 

pneumatic butterfly valve and sensor and so on.

1.Additive supplying pump power: GISG25-125-0.75KW

2. Pneumatic three way ball valve

3. Additive storage box: 2 m3            

4. Weighing precision: ±1% 

5. Weighing hopper pneumatic butterfly  Volume: 40L 

 

  8

Pneumatic system is composed of air compressor, gas cylinder, electromagnetic and pneumatic components. 

1) Air compressor: power: 11kW

2) Electromagnetic:

a) Main tower electromagnetic valve of 

pneumatic control case              

b) Cylinder electromagnetic valve   

c) Cement break electromagnetic valve  quantity is

same as powder storage

3) Air supply disposal components 

9

Control System

1. The operation is integrated with management .It is easy and convenient to operate.

2.The batching system is controlled by the microcomputer. 

3.The operating data of the mixing plant can be saved for more than ten years for the convenience of

setting management.

4.The formula which can reach more then dozens can express by the figures for the convenience of 

distinguishing. 

5. It has the function of error analysis and automatic checking.

6. Under the condition departing from the automatic control .The manual operating system can finish the 

control of the mixing plant such as batching, mixing discharging.

7. The heavy-current part of the system is separated from the weak-current part, so it enhances the ability

 of anti-jamming. Easy to maintain. 

8. Equip with printer

9. Equip with air-condition 

10.Control room: 6m2

System instruction:

The main hardware of this system adopts Germany Siemens  products with advanced performance, high 

reliability and beautiful exterior. Console adopts man-machine engineering design, comfortable operation.

12

Screw conveyor (optional)

1. Model:∮219 

2. Conveying capacity: 45t/h

3. Power: 11KW

4. Quantity: ∮219

13

Cement silo (optional)

1. Model: Piece type easy to load and transport

2. Capacity:  100t

Quantity:1 units

 We have the following services:

 

1. installation, debugging, operators trainning;

2. maintanence:

    A. when trainning your operators, our engineers will give them advice on how to operate the machines correctly;

    B. we will send you the operation manual which can help you operate the machins properly, it can also help you to solve   

   the common problems;

    C. Call us at any time if you have problems about our concrete plants;

    D. If needed, we will send engineers to your site to solve your problems.

3. providing documents needed for your customs clearance, like commercial invoice, packing list, certificate of origin etc;

4. spare parts supply;


FAQ:

Q1: Why buy Materials & Equipment from OKorder.com?

A1: All products offered byOKorder.com are carefully selected from China's most reliable manufacturing enterprises. Through its ISO certifications, OKorder.com adheres to the highest standards and a commitment to supply chain safety and customer satisfaction.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.

Q4: If we can produce some Concrete Machinery according to customersrequest?

A4: Yes, we can produce Concrete Machinery according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5:OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities &skilled personnel at site for training.

 




Q:Cement warehouse introduction, storage reserves?
There's nothing to come, but warm and young About 200 tons
Q:What does HZS mean in the HZS120 concrete mixing station
HZS refers to the production capacity per hour. The specifications of the mixing plant size is named according to the theory of production per hour, the specifications of the commonly used at present in our country are: HZS25, HZS35, HZS50, HZS60, HZS75, HZS90, HZS120, HZS150, HZS180, HZS240 etc. Such as: HZS25 refers to the production capacity of 25 cubic meters per hour mixing station, the host for the double shaft mixer. If the host to use single model for HZD25 horizontal spindle
Q:Which staff does the concrete mixing station need?
Mainly depends on how big is your station, whether can fully staffed, mainly included: general manager, deputy general manager, technology, webmaster, laboratory (deputy) director of the general, the production manager, sales managers, salespeople, scheduling, lab team leader, the operator (inspection), quality inspection, proportioning design, the material inspector technicians, machine operators, resposible, site, monitor of overhaul, maintenance engineer, loadometer, finance, cashier, mixers, pump truck drivers, company drivers, forklift driver, the handyman, chef, etc These are the main people who want to help you.
Q:What is the difference between a concrete mixer and a concrete mixer
The bone material of the mixing tower is on the top, and the aggregate is measured directly into the mixer. The concrete bin of the commercial concrete station is below, and the bone material is measured and then transported into the mixer after being transported by the inclined belt (which also has some use of the elevator). In a popular way, it is called the building, which is called the second ascent. The steel structure will be larger and the diagonal belt will be relatively longer because of the bone material in the mixing building. But in productivity, the churn is about a fifth higher than the commercial concrete station. In operation, because the inclined belt of the commercial concrete station starts frequently, the energy consumption and the failure rate will increase, and the energy consumption of the mixing building is lower than the failure rate. In the end, because the production capacity of the concrete station is small, the structure is easily disassembled and can be made into a container transfer site, which is suitable for the construction site. The mixing tower is large and high in productivity, and can only be used as a fixed mixer, suitable for the supply of large water projects or large quantities of goods. So customers in the difference between commercial concrete, concrete stand and commodity concrete mixing floor, from aggregate (material), the production efficiency and so on, to choose and buy the right equipment.
Q:The average commodity concrete is mixed with a day to use how much fly ash
What is the amount of cement in the concrete mixing station? This is based on the different levels of the concrete mix. Here is a different grade of concrete ingredients: Note: 1. The mix of concrete and concrete shall be carried out in uniform ratio of gravel and slump. In one project, the C40 is mixed with ordinary cement, and according to the proportion design, the maximum amount of coal ash can replace 40% of the cement consumption.
Q:How much concrete is produced by the js1000 type of the concrete mixing station
The production standard test concrete is not less than 50 cubic meters per hour. But the actual situation is (fully automatic), usually more than 40 cubic meters per hour. The cement productivity would be low by hand. Concrete mixing station, also known as concrete mixing station, concrete mixing station is mainly composed of mixing console, materials weighing system, conveying system, material storage system and control system and so on five big systems and other ancillary facilities. Because building aggregate measurement compared with standing aggregate metering, reduced the four of the intermediate links, and the vertical blanking metering, saved measuring time, thus greatly improving the production efficiency, under the condition of the same model, mixing building production efficiency than mixing plant production efficiency by a third. Concrete mixing station is mainly composed of material storage system, materials weighing system, material conveying system, mixing console and electric control system and other ancillary facilities. The mixing and electrical control system is a key part of the whole equipment.
Q:How much water does a concrete mixer use every day?
It is also a waste of water to flush the transports. Suppose you flush a vehicle with 1-2t water, rinse it 2-3 times a day, and use 20 cars a day for a medium size of a blender, 40 to 120 t a day. From this perspective, the reuse of washing water is very conducive to environmental protection and water conservation. The rational recycling of water in the mixing stations is also gradually being promoted. Our new hydraulic patent product concrete wastewater and sewage circulation recycling used by many domestic manufacturers, most of new mixing plant began to use the recycling equipment. The wastewater recovery system has made some efforts for the environmental cause of China.
Q:The main components of a mixing station
Feeding system: aggregate bucket, aggregate weighing hopper, flat belt machine, inclined belt conveyor. Mixing system: the main machine is a double-deckshaft mixer, reducer, cement weighing hopper, water and additive weighing hopper. Cement supply system: cement warehouse, screw conveyor, air compressor, screw electronic. Automatic water supply system: water tank, pump, pipe. Electrical operating system: computer console, electric control cabinet, operation room. Operation control system: microcomputer control or manual control.
Q:What constitutes the js750 concrete mixing station
pecific configuration can be cut can be numerous js750 hosts are commonly used to climb a pipe loading, the concrete quality requirement is not high do not need automatic batching only buy a belt bucket host to climb to go, with a tractor modified small forklift about yao to climb add material in the bucket.
Q:How long does it take to build a concrete mixer station?
Normally, between one and three weeks. Plan the main points of the stirring station Venue: single 2m3, 3m3, the equipment occupies an area of about 21mx51m. Add in the yard, parking lot, road, office building, repair shop, recycling pool and so on, usually need the site 40mx80m (the land of 5 acres). 2m3 and 3m3 stations usually require 60mx80m (7.5 acres). If the location is more complex, the layout of the equipment should be based on the utilization of the site. To reduce the cost of future operations, it is suggested that there be a river at the edge of the site so that it can be used to carry sand stones. Distance should consider the best range of concrete delivery vehicles, not too far away from the main site, but also for future development. Optional: choose according to the expected amount of concrete. In a year of 300 working days, eight hours a day, the actual efficiency is lower than the nominal value given the various factors that are affected. Considering the requirement of the equipment for regular maintenance and maintenance, and the requirement of the high demand in some period, it is suggested that the equipment should be purchased. In some areas, the construction of new concrete and concrete stations must be at least two.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords