• Wire Collect Cable Ties System 1
Wire Collect Cable Ties

Wire Collect Cable Ties

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1000 Pieces pc
Supply Capability:
50000 Pieces per Day pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1.L-preformed tie shape helps strapped object closer attach to fixing point, minimizing the space taken.

2.Outside serrated design ensures not causing damages to the bundle surface, especially in vibration environments.

3.Low insertion force is required.

4.Extra extended pawl helps release the ties quicker and easier while operating in restricted space of automobile.

5.Releasable design is ideal for the occasion where reinstallation is required.

6.Added width of cable tie offered a more secure fixing that the firm fasten is asked for.

7.Special specifications supplied by customers' order.

8.Material: Polyamide 6,6, UL94 V2

9.Color: Black

Q:Dual-value capacitor asynchronous motor starting up the speed is high and low What is the reason, the motor rotation just to the high speed suddenly down again more
Since it is a discrete graphics, it is recommended to change the motherboard . although the price is almost, but 870 is usually a large board, suitable for wiring, and then graphics from the CPU to be far, so more stable. Graphics currently 5770 the most cost-effective.
Q:The elevator has 23 floors. But I have not installed before. I would like to ask how to install. How does the video line go? Thank you more
Contact the elevator manufacturers with a few holes in the top of the elevator to fix the camera, the top of the elevator can be powered, the video line elevator manufacturers are equipped with a dedicated, it is the kind of soft can move up and down with the elevator, Go on the line, you need to pull from the monitoring room to the elevator room to receive its video line on the line.
Q:What are the maintenance knowledge of the manipulator?
1: rails and bearings to keep all the shafts at the guide and bearing cleaning and good lubrication performance
Q:How does the geothermal switch above the sensor line pick up?
Can be removed after the general two sets of lines, a group of power lines, but the notebook screen power cord and desktop is not the same, usually 12v high pressure package, so you have to prepare 12v transformer power supply to it, the other line is the signal Line, and see a few cores, y should be able to add a conversion port into hdml line. But now based on the display price is not expensive, there is a risk of modification, personally feel that little, if the host is broken, the display intact, it is better to put Taobao, sell, sell money to buy a new desktop!
Q:What are the precautions for using the cable mesh and how to use it?
No instructions are clearly stated or allowed. In the "Code for Design of Electric Power Cables" (GB-2007), the provisions of 5.1.3 stipulate that if the number of cables in the same channel is large, if the laying of the multi-layer bracket on the same side, the following provisions shall be met: High to low power cables, strong to weak control and signal cables, communication cables "top to bottom" in the order. When the horizontal channel contains more than 35kV high-voltage cable, or to meet the introduction of the cabinet tray to meet the requirements of the bend radius requirements, should be "bottom-up" in order. In the same project or the cable channel extends to different projects, should be arranged in the same order. 2 bracket space by the channel space constraints, 35kV and below the adjacent voltage level power cables can be arranged in the same layer of support, 1kV and below the power cable can also be with the strong control and signal cable configuration in the same layer of the bracket. 3 The work of the same important circuit and the backup cable should be arranged on the different layers of the brackets. It is possible to note that it is restricted by passage space from section 2. If you really want to lay together, it should be noted that 10kV cable can not use single-core cable, you need to use three-core cable.
Q:I would like to ask the next communication project in the cable tie is what the situation to use, how to calculate it?
This need to see what you said the bend of the pipe elbow is what kind of if it is ninety degrees elbow, it is too much trouble, you can use wire lead
Q:Communication equipment and telephone routine maintenance inspection need to pay attention to what
if the TV screen appears set-top box to start the image and then prompt "no signal" situation, this phenomenon proves that the set-top box and the TV between the audio and video lines (red, yellow, white) connection is basically no problem
Q:I would like to ask you friends, merchandise residential house inside the cable how to arrange, I saw in the weak box has a fiber optic cable home, that is, I do not know how to lay, I do not understand, I think you look, if the light cat and router can Placed in the weak box, the router from the router to the network assigned to each room, if the routing into the weak box will not be wireless signal attenuation, the younger brother is a novice, do not understand, please heroes branch try to jealousy Spring but Shanghai move, very grateful, no wealth value, I am sorry. More
Usually less than the core number, the product diameter is small, the structure of a simple product called the wire, there is no insulation called bare wire, the other known as the cable; conductor cross-sectional area larger (more than 6 square millimeters) known as large wire, Small (less than or equal to 6 square millimeters) is called a small wire, insulated wire, also known as cloth wire The type and order of the wire and cable are as follows: [1: Category, use] [2: Conductor] [3: Insulation] [4: Inner cover] [5: Structural features] [6: Outer sheath or derivative] [7 : Let the manganese container] 1-5 and 7 are indicated by phonetic alphabet The polymer material is indicated by the first letter of the English name Each item can be 1-2 letters The sixth item is 1-3 numbers Model of the principle of omission: wire and cable products, copper is the main use of the conductor material, so the copper code T write, but bare wire and bare conductor products except Bare wires and bare conductor products, power cables, electromagnetic wire products do not indicate a large class code, electrical equipment, wire and cable and communication cable category is not listed, but set out small class or series code Item 7 is a special use of special occasions or additional special requirements of the mark, in the "-" after the alphabet letters Sometimes in order to highlight the item, write this to the front Such as ZR- (flame retardant), NH- (refractory), WDZ- (low smoke and halogen, enterprise standard), - TH (for hot and humid areas), FY- (anti-termite, enterprise standard) and so on Power Cable Armor and Outer Jacket Digital Numeric Marking Armored Outer Layer or Outer Jacket 0 No --- 1 Interlocking Armored Fiber Outer 2 Double Layer Steel Strip PVC Coat 3 Fine Round Wire Polyethylene Jacket 4 thick steel wire --- 5 wrinkles (embossed) steel strip --- 6 double aluminum (or aluminum) with --- 7 copper wire braided --- 8 wire braided --- wire and cable products
Q:What is the name of this plastic buckle? Since the US military used to replace handcuffs, it must be very strong, what is the plastic? More
Is the nylon cable ties, but the quality of good points
Q:What equipment does fiber engineering need? What are the brands?
Do outdoor fiber engineering. Sure to have steel wire, cable hook. Tighten the wire. There are escalators. But also more than 6M bamboo ladder. Because the strand to be linked to the 6M high position can be. Into the room, it is very simple. Pigtails, fiber jumpers, fiber patch panels. Couplers and so on. And then spread out the fiber from the inside of the cabinet after the patch panel. Then fused. After a good tie with a good tie. It is best to use optical power meter test under the barrier. Whether the attenuation meets the standard.
Our facilities are equipped with over 150 injection molding machines to produce full line of cable ties, stainless steel ties, wiring terminals, wiring ducts, flexible conduits, adaptors, and so on. The number of employees worldwide is around 1,500. We welcome customers from the entire world to cooperate with us.

1. Manufacturer Overview

Location Taiwan
Year Established 1976
Annual Output Value
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Eastern Asia
Western Europe
Central America
Northern Europe
Southern Europe
South Asia
Domestic Market
Company Certifications ISO 9001:2008;ISO 14001:2004;ISO/TS 16949

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Laem Chebang/Thailand,Bangkok/Thailand,Donnguan/China
Export Percentage 91% - 100%
No.of Employees in Trade Department 21-50 People
Language Spoken: English, Chinese, Spanish, Japanese
b)Factory Information  
Factory Size:
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range High and/or Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords