• Plyurethane Coated Fiberglass Sleeving 35mm System 1
Plyurethane Coated Fiberglass Sleeving 35mm

Plyurethane Coated Fiberglass Sleeving 35mm

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
2000 Meters watt
Supply Capability:
10000000 Meters per Week watt/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

STRUCTURE

 

PU glassfiber sleeving is non-alkali glassfiber braided then coated with polyurethane resin and treated by high temperature.

 

 

USAGE

 

PU glassfiber sleeving possesses reliable heat resistance, good qualities of dielectric. It can be used for wiring insulation and mechanic protection for F grade electrical machinery electric appliances

 

 

SPECIFICATION

 

I.D.

(mm)

Tolerance

(mm)

Thickness(mm)

Breakdown voltage

1500V

Thickness(mm)

Breakdown voltage

2500V

Thickness(mm)

Breakdown voltage

4000V

Thickness(mm)

Breakdown voltage

7000V

0.5 to 3.5

+0.2-0.1

0.38±0.12

0.41±0.12

0.45±0.15

0.52±0.15

4.0 to 9.0

+0.2-0.1

0.42±0.15

0.46±0.15

0.48±0.15

0.55±0.15

10 to 16

+0.5-0.1

0.50±0.20

0.52±0.20

0.58±0.20

0.65±0.20

18 to 35

+0.7-0.1

0.65±0.25

0.70±0.25

0.75±0.25

1.10±0.30

Q:Cable protection tube where the need to play a trumpet what role
Cable bridge connection piece and the crossbar respectively: the bridge connection piece is the connection device, is in the direction of the longitudinal extension of the bridge to connect the adjacent two sections of the bridge, and the cross is a component of the bridge hanger; cable bridge connection And the bridge has a fixed bolt with a prefabricated hole (or groove), and the cross is the staircase bridge inside the brace; the extension of the bridge when the bridge with a bridge connection, and the bridge when used to cross the fork. At this time to use hoisting bracket. The lifting bracket is composed of a boom and a crossbar, and the shape is U-shaped. The upper end of the boom is fixed on the support of the roof board and the lower end is used to support the weight of the bridge.
Q:Is there a need for a cable for a buried cable? The
How much must use the boom without any rigid requirements. Cable bridge standard JB-T-2000 only said that the support hanger selected materials should be consistent with their own relevant provisions; various types of hanger should be able to withstand the appropriate specifications (layers) tray, ladder rated uniform Load, meet the strength, stiffness and stability requirements. The ratio of the maximum deflection value of the cross brackets or side brackets of the steel hanger to the rated load shall not exceed 1/100 of the length of the hanger itself. Arm for the aluminum, it should not be greater than 1/150.
Q:How should the pipe remove the debris and water before passing the wire?
It should be YJV cable. YJV: XLPE insulated PVC sheathed power cable VLV: PVC sheathed polyethylene insulated aluminum core power cable
Q:If it is two 6 mm square wire should wear much PVC pipe? 2.5 square it, how much? More
To consider the power line power load, power line heating problems and cooling conditions. For weak signal lines, we must consider the electromagnetic compatibility issues, to ensure shielding isolation. In the heat and shielding problems are guaranteed under the premise can be placed in the same trunking. Generally hope that strong and weak lines separated from the different trunking, easy to repair the safety and convenience.
Q:Cable trench and pipe guru cross, the cable can pass through the trench in the past? Question added: If you can not wear trench, how to deal with? More
Switch into the fire line with a wire and socket L connected to the zero line into the N, a ground on the ground. This is then connected to the switch is not control socket Di.
Q:For example, as a lightning rod down the line of single-core high-voltage cable, you can use a set of metal pipe laying? Is not to consider some of the problems of electromagnetic induction?
From top to bottom if there are four layers of cable bridge or bracket in order: high-pressure power, low-voltage power, control cables, communications and computer cables, the best ground to the bottom of a layer. High-voltage cable load, easy to produce high temperature. If the laying in the lower, will have a great impact on the above low-voltage cable, the best on the upper, there is a little, high-voltage cables are generally steel armor layer, high mechanical strength, even without steel armor due to insulation Thick, bear the impact of the general object is also strong, for cable protection has some advantages.
Q:How to deal with the laying of wire and cable at the intersection of the project
The front point of the information cable (super 5 or 6 lines) into the equipment room after the first access to the patch panel, the line hit the patch panel module, and then use the jumper (RJ45 interface) to connect the patch panel and switch The In general, the patch panel is used to manage the equipment, for example, if there is no patch panel, front-end information points directly connected to the switch, then if the cable once the problem, it is facing to re-wiring
Q:Such as the question, there is no relevant provisions of the test report of the validity of how long! Question added: I said that the metal wire tube, the general inspection report, not CQC, this did not indicate the validity period, the date of issue is June . 2006; but there is a "quality management system certification", stated The deadline is June . 2009; that we can use this product and the inspection report retrial? More
Can not be cut along the horizontal direction of the wall, the wall of the depth of the chisel should be adequate to protect the thickness of the tube, generally 25. In accordance with the norms should be in 28 days after the exclusion.
Q:Cable laying allows the laying of steel pipe laying, and insulated wire according to the regulations 8.3.9 should not wear metal pipe in the outdoor direct laying. If necessary, for the secondary load and the line is less than 15m, can be used to wear metal pipe laying, but should be used not less than 2mm wall thickness of the steel pipe, and take a reliable waterproof, anti-corrosion measures. Personal understanding is because: cable laying through the metal pipe through the thicker, to achieve water and corrosion requirements, and wire room wear metal pipe laying, the metal pipe is thin, may not reach the water and corrosion requirements? Or cable insulation has 2 layers, and the wire is only 1 layer, so buried in the outdoor pipe, the more humid environment, the cable can not wire? Seek answers. Thank you. More
Connect the set-top box to the TV with a trumpet audio and video line One end of the control color were inserted into the set-top box after the audio and video output, the other end of the same method into the TV audio and video input Cable TV set-top box installation Note: TV audio and video port generally have a number of groups, divided into audio and video input and audio and video output, each group by AV AV ¨¨¨ or input audio and video cable into which group of input on the use of TV which video to watch digital TV, such as the insertion of the "audio and video input", and then insert the audio and video input, Enter 2 ", will TV to AV2 watch digital TV programs Check that the smart card is properly loaded in the set-top box The correct placement of the smart card is: smart card face up, red arrow inward Set-top box front panel has a card interface, the smart card can be placed on the right Turn on the TV and set-top box power and use the video switch on the TV remote control to bring the TV to the correct video Cable TV set-top box installation details: TV remote control video conversion keys are generally marked as "AV" or "AV / TV" or "video" or "TV / video" or "→ ⊙" 5 TV screen appears on the set-top box to play the content, if prompted to search for programs in accordance with the instructions or instructions to search for programs, and then you can watch the normal
Q:What is the commonly used communication cable connection casing?
the first production of the two long sides of the antenna, interception of copper wire when the length of attention to the accuracy
Our products are in conformance with UL, CSA, RoHS and REACH standards. All these products are widely used in electromechanical, electric heating devices, electronic wiring, household electrical appliance, lighting, automotive and tooling area etc. We welcome customers from the entire world to cooperate with us.

1. Manufacturer Overview

Location Guangdong,China
Year Established 2008
Annual Output Value US$5 Million - US$10 Million
Main Markets 12.50% North America
12.50% South America
12.50% Eastern Europe
12.50% Southeast Asia
12.50% Oceania
12.50% Western Europe
12.50% Northern Europe
12.50% Southern Europe
Company Certifications ISO9001:2008;RoHs;CSA Certificate UZFT8

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Shenzhen,Guangzhou,Hongkong
Export Percentage 41% - 50%
No.of Employees in Trade Department 3-5 People
Language Spoken: English, Chinese
b)Factory Information  
Factory Size: 10,000-30,000 square meters
No. of Production Lines 5
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches