There is heating the ground, the above to add light steel keel wall how to deal with?
First find out the ground to the laying of the warm tube, it is best to get to warm the construction drawings and then according to the marked on the map, looking away from the far away to cross the line to see and design the wall is likely to be compatible, and then play Bolt, install the keel. Estimated not easy to get, to be very careful, before the construction of the warm door off, the water vent and then get.
Light steel keel gypsum board cut off how much money a square
Material costs 20-30 yuan / m2, labor costs are not the same as the region, 30-50 yuan / m2 or so.
Construction Technology of Silicon and Caelite Ceiling in Light Steel
Calcium silicate board ceiling is the main advantage of light, waterproof, sound absorption, construction is simple. 1) Material requirements Calcium silicate board specifications, performance indicators meet the design and the corresponding acceptance requirements. The keel, boom and fittings required for the ceiling meet the requirements of the design and catalog specifications. 2) The main construction tools Electric saw, no tooth saw, nail gun, hand saw, hand plane, pliers, screwdriver, wrench, square feet, steel ruler, steel tape and so on. 3) construction conditions and related environment around the wall playing a good roof + 50cm level elevation control line, and verification is completed. ?Install the roof of the various lines and ventilation ducts, to determine the light, ventilation and a variety of exposed Ming mouth position. And check the height of the ceiling and its equipment within the impact of elevation. ?Check whether the materials and fittings used are well prepared. Before the keel, you must complete the wet work on the wall surface. Erected a roof construction platform. Calcium silicate board keel ceiling in a large area before the construction, should do the model, the ceiling from the crown, lamp trough, vents of the tectonic treatment, block and fixed method should be tested and identified after a large area construction.
I am doing a ceiling tile for my English class. I have 2 differnet background options I want to do. It doesn't matter what background I choose I will put my name and 2013 on it. 1. Just do the whole background with blue glitter 2. Do a texas flag in glitter
If it the type of tile you can take down from a grid, take it down and outside and use spray paint. If you are handy with masking tape, you can put the design on after you paint the background first.
How can we calculate the cost of paint keel?
Keel surface area, (long by wide + long by high + wide by high) by 2 Asked: This is the cost of the formula? Answer: This is the keel surface area, calculate the area need to use a few paint on it. Or with a specified amount of paint, to see how many root keel can be painted, can be.
Interior decoration light steel keel ceiling in the main keel, vice keel spacing according to the specification should be how much?
Process: Slide - → Install the big keel boom - → install the big keel - → install the keel - → install the keel - → install the cover cotton board - → install the pressure bar - → brush anti-rust paint
Thank you for my doubts! The I have more than ten years of decoration construction experience, and now in Hangzhou to do a deep investment project, Hangzhou Xixi Wal-Mart project, construction area of 210,000 square meters, a new manager said gypsum board must be parallel to the keel installation, In the main keel, tens of thousands of square meters of smallpox, I worry about the future problems, check the specification did not have any results, I hope to know the norms or construction Atlas friends give me a strong basis!
Of course there are norms, long side parallel with the vice keel. Or you have long edge seams, that big trouble, not solid.
Installation of light steel keel edge keel with wooden square fixed and no wooden square fixed what is the difference?