Assembly Precision Box Girder Steel Template
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
BOX GIRDER
External formwork of 32/24 meters post-tensioning concrete pre-faricated box girder is divided into sliding mode and
rolling mode; the side form of the first mode can move from one bottom form to the other one which increases the
utilization rate, and decrease the investment for the formwork during construction; the side form of the second mode
is relatively fixed according to the bottom form, and could be dismantled by revolving, which improve the efficiency
of formwork closure.The side formwork unit is mainly 6 meters, the design of the sructure is compact
and reasonable with beautiful and smooth appearance.
Features
■ All the edges of ecternal formwork panels for the box girder have been milled, which ensure
the assembly precision to avoid the leakage of the concrete
■ The bottom formwork unit is 3 meters to facilitate the installation and anti-arch adjustment
■ The bulkhead is designed to envelop the sideform,which can be wholely assembled, making the removal, installation and adjustment much easier.
- Q:The formula for the calculation of beam, concrete and brick
- (1) single beam, the support of the template is not deducted, the end of the template does not increase. Beam length(2) when the beam and beam intersect, the area of the main girder is not deducted.(3) beam, plate connection, beam wall template to plate ping.
- Q:How to put the beam formwork in concrete structure
- When the carpenter die down from the ceiling! To determine! But you need to check it regularly! Not everyone does it by the rules!
- Q:The calculation formula of the beam column for the construction of the concrete and the use of the template area of the detailed point of the best thank you
- Refer to JGJ 162-2008 construction formwork safety technical specifications
- Q:Remove the larger span of the beam pillar template why should be removed from the middle to the two ends
- The maximum bending moment in the middle of the beam is removed from the middle of the support, the stress is concentrated on the two supporting end, and the final force form is the same as the reinforcement of the beam, and the bending and the excessive shear force are not generated
- Q:How to do irrigation formwork
- For plate 120 H-0.05, the -0.05 here is the elevation of the plate is reduced by 5cm. - drop, + raise. Here the drop and elevation are relative floor elevation.
- Q:When Liang Banzhong beam template calculation is the calculation of him in the board? Because in the calculation of engineering quantity of concrete beam by beam plate calculation. But when the template is, the book is not clear. In the calculation of the time quota template can have a beam plate.I use the Guizhou 04 quotaEspecially your last sentence, I haven't said anything yet,There is the Guizhou 04 fixed and did not say what sub beam frame beam separationAbove the beam plate is to explain the main beam, sub beam and plate, according to the calculation of beam and plate volumeThen you explain to me the frame beam is not the main beam? According to this explanation, why do you separate the frame beam
- Calculate the area between the axis, into the wall of the plate into the area of the plate, and then deduct more than 0.3 of the hole, that is, the area of the beam plate
- Q:Beam column plate template how to calculate the need to deduct what part?
- A method is relatively simple and practicalThe calculation formula of the first column is the circumference multiplied by the height of the unit is M2
- Q:The section size of the beam is 200 x 400 the size of the board is 4500 x 4000 plate thickness of the formula for 120 - a rookie
- The side plate of the plate is the circumference of the plate (minus the protruding part of the column) multiplied by the thickness of the plate 0.1m.Beam slab:Plate beam T beam box girder is divided into cast in place PC box girder and steel box girderBeam type structural member composed of steel plates. The basic section is I-shaped, upper and lower transverse wing plate is vertical plate, the middle name web. Some plates are welded with reinforcing ribs. According to the combination method, it can be divided into welding plate beam, high strength bolt plate beam and dissimilar steel plate beam. Reinforced concrete slab beam.
- Q:The area of the beam template = (both sides of the high and low beam) * beam lengthWhat do you mean by the two words in the brackets?
- Calculation of contact area between concrete and formworkPillar: circumference multiplied by the column height, from the pile or board surface of a first floor surface, non beam plate count to the bottom of the column cap
- Q:According to the experience, who knows the construction area and template, plate, column, beam volume, steel, etc.!
- Shear wall structure (such as small high-rise, high-rise) per square meter area of the content of the building: the template to expand the area of about 3.3 to 3.6 square meters,About 0.5 cubic meters of concrete, steel bar about 60 to 75Kg.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Assembly Precision Box Girder Steel Template
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords