• Column and Shear Wall Formwork System - SF120 System 1
  • Column and Shear Wall Formwork System - SF120 System 2
  • Column and Shear Wall Formwork System - SF120 System 3
  • Column and Shear Wall Formwork System - SF120 System 4
  • Column and Shear Wall Formwork System - SF120 System 5
  • Column and Shear Wall Formwork System - SF120 System 6
Column and Shear Wall Formwork System - SF120

Column and Shear Wall Formwork System - SF120

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Column and Shear Wall Formwork System

The template is composed of a plywood panel embedded special air abdominal type steel. The panel is 18mm thick plywood. The template size standardization degree is high, flexible assembly, can use wood clamping side splicing method to meet the needs of non-standard size.The frame of high stiffness, reasonable stress, design of side pressure is 60KN/m2 ~ 80KN/m2.Using unified adjustable steel frame template assembling fixture, convenient and quick, firm clamping. The template corner can provide the prying opening, positioning and convenient removal of the template. Steel frame and panel connected by screws from the back way, good molding effect of concrete. The template complete product system accessories, variety complete, can according to the need of the project in any combination, flexible arrangement and convenient.

 

2. Main Features of Column and Shear Wall Formwork System

◆ Allowable pressure is 80KN/m2 .

◆ Faster and easy operation.

◆ The dimension for column is adjustable.

 

3. Column and Shear Wall Formwork System Images

 

 

 

 

 

4. Column and Shear Wall Formwork System Specification

Column and Shear Wall Formwork System - SF120

 

5. FAQ of Column and Shear Wall Formwork System

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

 

2) What promises can be done by us?

If interested in Column and Shear Wall Formwork System with Single Side Bracket, please feel free to write us for any QUOTE.

If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

Response will be carried out in 24hours  after receiving any complain or request.

If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

4) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

Shipping time:Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. Other mass qty of Column and Shear Wall Formwork System, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days. 

Q:How to support 6m arc beam template how to set up?
After setting out in accordance with graphics support ah. If the curvature is large, it can be approximated by linear segmentation.
Q:Beam plate with a few face template
The beam of the beam plate is made up of 3 face plates, a bottom die and two side moulds
Q:More than the number of square cross-section of the beam high formwork
According to the "dangerous method" sub project safety management of the construction quality of [2009]87, the height of more than 5m, the total construction loads greater than 10kN/m2, or the template support system concentrated line load greater than 15kN/m to prepare special construction scheme
Q:The main floor beam template installation should pay attention to what?
2) install the side formwork of the beam and drill the side of the side of the side of the pull screw hole after the additional diagonal reinforcement.3 check the beam center line, elevation, section size, adjacent beam column template connection is fixed.4) after the beam and plate steel reinforcement is finished, the 1/2 pairs of the beam height are put on the pull screw, and the outer part of the pull screw is coated with a hard PVC casing, and the screw spacing is 1000mm.
Q:When the main beam and secondary beam connection, calculate the area of the template is good, there is no simple method
The landlord is complicated. When the beam is calculated, the main girder is calculated, and the axis is the length of the axis
Q:The calculation formula of the beam column for the construction of the concrete and the use of the template area of the detailed point of the best thank you
Refer to JGJ 162-2008 construction formwork safety technical specifications
Q:What is the meaning of the steel beam overhead on the top of the beam formwork
So in the form of the frame up binding, binding with a crane to lift the steel beam, the following overhead with the wood out of the beam of steel on the template
Q:First of all, what are the construction of the structure of the template, such as walls, columns, beams and ladders, which is the structure of the first installation of the template after the installation of steel? Ten
The template of the beam can be completed in two or once. The two is complete, first beam bottom mould, then binding steel beam and plate, and side template; a beam bottom and side is template template and template to support end, then lashing steel beam on the template, binding after the beam falls on the beam within the template, and then tie plate reinforced.
Q:Beam column plate template how to calculate the need to deduct what part?
Plate under the formwork and then if there is a beam under the board, then the beam and the plate side of the area to cut off the sideDo not understand the words can continue to ask
Q:When there is a beam plate template, the beam can not be added to the template?
When you have a beam template, you can not add the foundation beam template! Their price is not the same, to separate! (mainly reflected in measures)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords