UNCONVENTIONAL RHOMBIC FORM TRAVELLER

The front tranverse beam gravity height of unconventional rhombic
form traveller is betwwen the height of rhombic form traveler and
triangular form traveler. Comparing with rhombic form traveler and
triangular form traveler, it has the advantages of low gravity height,
more operational space than triangular form traveler, easy operation,
safety during walking and firm anchorage, etc..

● Low gravity of front trancerse beam

● Applicable to large-scale stay-cable cantilever casting bridge with wide bridge deck

● Safe & easy operation, easy fixing, and safty during walking

● Big operational space under the main frame, and easy installation and removal

Q:How to deal with the broken of the cross beam of the hanging basket
Your cantilever cast-in-place box girder is not prestressed construction.Need to identify the type of crack, if it is hot up cracks or superficial expansion cracks, the depth of not more than 2mm, not to the vertical and horizontal direction of development is not related, you can not deal with.
Q:What are the innovative points of hanging basket construction
Management points:1 the concrete pouring on both sides of the beam should be symmetrical and balanced, and the unbalanced construction load should not be greater than the allowable value;2 concrete should be rapid, continuous construction, in the first pouring of concrete before the first pouring all completed;3 the bottom plate, the web and the roof are symmetrically layered, and the layer thickness should not be greater than 30cm;
Q:Hanging basket construction continuous beam, the adjacent fast is how to connect, such as Block 0 and block No. 1
3, installation of connecting two adjacent segments (such as 0# and 1#, 0# and 1 "#) corrugated pipe hole, and wear long (such as 1# to 0# to 1" # through wearing steel strand).
Q:Hanging basket installation, removal of dangerous source identification
In general, there may be hidden dangers of accidents, there may be no hidden dangers for the existence of hidden dangers of accidents must be timely rectification, otherwise it may lead to accidents.
Q:Is hanging basket equipment special equipment? Need to record it?
After the completion of the installation of special equipment, construction safety supervision station shall apply for registration procedures
Q:I'm British and traveling to Cuba whats the best form of travelers cheque to buy?
well i dont know much about cuba even thow im from the caribbean, i think they use their own money, dont know if pounds gonna work they, if i where you i would get some us money it can be spend anywhere in the caribbean and since pounds is worth more than us dollars you would be in good shape anyway hope you know spanish good luck and send me a post card.
Q:What's the meaning of the main truss in the basket?
H ngli ng trussThe [brace girder] is composed of a plurality of slats of the web and the two sides of the connection of the girder
Q:What is the meaning of the bridge basket and bridge system
The main reason is because the bridge closure, temporary support, removal or addition of constraints, the system stress of bridge structure by the beam into continuous beam, or by the static structure into a statically indeterminate structure, or by N statically indeterminate structure into N+ (-) M statically indeterminate structure.
Q:Hanging basket construction contract unit price
Prestressed reinforcement, install t 350Steel strand tension and grouting t 1100Tension and grouting of prestressed steel t 450Hang up 30000Temporary consolidation 12000Bracket safety m3 12
Q:Operating rules for hanging baskets
The hanging basket construction technology of formwork installation requirements is very high, must be strong, to prevent overturning, concrete pouring down. In addition, the control of formwork elevation is directly related to the precision of pouring concrete and the height of the box girder. Therefore, the elevation of formwork must be determined according to the pre camber of the design and the deflection of the basket.Technical specification for operation of formwork must pay attention to the following points: A1 first before using the rod on the beam bottom die height; B1 theodolite fixed bottom die axis; C1 fixed bottom die, covered with plastic plates, and adjust the width of the middle floor steel frame production to adjust the width of the bottom mold; the elevation of D, adjusting the lateral mode and the edge template and inclination; the elevation of E1 using the template template before adjusting rod.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords