• Waterproof Safe Single - Side Climbing Formwork For Wall System 1
  • Waterproof Safe Single - Side Climbing Formwork For Wall System 2
  • Waterproof Safe Single - Side Climbing Formwork For Wall System 3
  • Waterproof Safe Single - Side Climbing Formwork For Wall System 4
  • Waterproof Safe Single - Side Climbing Formwork For Wall System 5
  • Waterproof Safe Single - Side Climbing Formwork For Wall System 6
Waterproof Safe Single - Side Climbing Formwork For Wall

Waterproof Safe Single - Side Climbing Formwork For Wall

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Waterproof Safe Single - Side Climbing Formwork For Wall

With CMAX SCB180 climbing systems, the loads from the fresh concrete pressure are transferred through the brackets by means of V-strong backs and compression braces into the scaffold anchors.

Typical applications for the SCB 180 system are dams, locks, cooling towers, pier heads, tunnels, and bank vaults.

The formwork is simply tilted backwards when striking takes place. The 1.80 m wide bracket requires only a minimum of space.

 

2. Main Features of Waterproof Safe Single - Side Climbing Formwork For Wall

A) Economical and safe anchoring

The M30/D20 climbing cones have been designed especially for single-sided concreting using SCB180 in dam construction, and to allow the transfer of high tensile and shear forces into the still fresh, unreinforced concrete. Without wall-through tie-rods, finished concrete is perfect.

B) Stable and cost-effective for high loads.

Generous bracket spacing allow large-area formwork units with optimal utilization of the bearing capacity. This leads to extremely economical solutions.

C) Simple and flexible planning

With SCB180 single-sided climbing formwork, circular structures can also be concreted without undergoing any large planning process. Even use on inclined walls is feasible without any special measures because additional concrete loads or lifting forces can be safely transferred into the structure.

D) It is with the advantages of standard design, excellent applicability and interchangeable.

 

3. Waterproof Safe Single - Side Climbing Formwork For Wall Images

 

 

4. Waterproof Safe Single - Side Climbing Formwork For Wall Specification

Waterproof Safe Single - Side Climbing Formwork For Wall

 

5. FAQ of Waterproof Safe Single - Side Climbing Formwork For Wall

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

 

2) What promises can be done by us?

If interested in Waterproof Safe Single - Side Climbing Formwork For Wall, please feel free to write us for any QUOTE.

If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

Response will be carried out in 24hours  after receiving any complain or request.

If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

4) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

Shipping time:Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. Other mass qty of TWaterproof Safe Single - Side Climbing Formwork For Wall, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  

Q:Calculate the beam template when you want to reduce the thickness of the plate
Building template is a temporary support structure is made according to the design requirements, the concrete structure components, according to the position and size of the provisions of forming, maintaining its correct position, external loads and under construction template gravity and acting on the. The purpose of template engineering is to ensure the quality of concrete engineering and construction safety, speed up the construction progress and reduce the cost of the project.
Q:The calculation of formwork engineering quantity of ground beam needs to calculate the bottom of beam
The calculation of the formwork quantity of the beam is not needed to calculate the bottom of the beam
Q:How to put the beam formwork in concrete structure
By way of hanging on the board, you do not want to put a line for you!
Q:How to control the elevation of the beam bottom and the axis position
The axis is controlled by hanging the ball down to the lower floor axis and the axis control line.
Q:The formwork support is a beam template which is connected with both sides of the vertical rod and the force at the bottom of the beam and the force of the vertical wire rod which is arranged below the transverse beam at the bottom of the beam
Note: when the right angle fastener tightening torque of 40--65N.m, test shows that the single fastener will slide in the 12kN under the load, the sliding bearing capacity of desirable 8.0kN; double fastener will slide in the 20kN under the load, the sliding bearing capacity to be 12.0kN.Note: the above values are experimental values! Take a look at your calculation results and this value to meet the double anti sliding bearing capacity can be!
Q:10-3 degrees of weather, cast in situ floor and girder formwork can be demolished a few days? 25 days enough? There's a wall on the beam.
For the concrete structure engineering, the concrete strength can reach the design of the concrete cube compressive strength of the standard value of a certain amount, before the template can be removed the standard value.
Q:How to calculate the intersection of rectangular column and beam
Beam:(1): the length of beam to column connection, the length of the beam to column side; girder transfer, beam to beam side. The beam length at the door (window) wide hole net length calculation. According to the center line, wall beam wall is calculated according to the net line.(2) the area of the beam connecting part is not deducted, and the area of the beam head is not increased(3) the area of the beam pad is incorporated into the beam
Q:Beam plate template is composed of the bottom template and what
Rectangle, F=1, A is the length of the bottom edge, B is high..... So, S1S2, S3,..., one by one. The sum of the above Si is the total area. The amount of template engineering is required
Q:Should not be on the front and back of the four sides of the template? Why is the width of the beam length multiplied by the beam surface? Isn't that the three face?
Only the bottom surface of the beam and two sides of the template, there is no need to shop template.
Q:Beam column plate template how to calculate the need to deduct what part?
A method is relatively simple and practicalThe calculation formula of the first column is the circumference multiplied by the height of the unit is M2

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords